Project Completed
Project Scope:
An existing school that has 115,071 square feet with an enrollment of 285 students in grades 7-12 located in Cross, SC. The scope of this project consisted of expanding the auditorium into the existing Media Center and relocating the Media Center to an area that is assessable to the local community. The project also included a face lift and reconfiguration to the locker rooms adjacent to the gym to accommodate the visitor team within the current space. The current space includes locker rooms, storage rooms, and coaches' offices.
- New Auditorium: 9,896 sq. ft.
- Media Center: 2,973 sq. ft.
- Locker Rooms: 4,287 sq. ft.
- Total of Renovated Areas: 17,156 sq. ft.
- Current Construction: $3,181,467.00
- Bid Date: June 2014
The Architect Selected for this Project:
Sam Herin, AIA
STUBBS MULDROW HERIN architects, inc.
400 Hibben Street
Mount Pleasant, SC 29464
Office: 843-881-7642
Fax: 843-884-5021
The Contractor Selected for this Project:
Thompson Turner Construction
100 North Main Street
Sumter, SC 29150
Office: 803-972-0447
Fax: 803-938-8619